Group Info

  • Inspection Before Countersunk Carriage Bolt Delivery Business & Finance
  • 1. Perform a general survey of high-strength bolts with a small hammer to prevent leakage.

    2. The inspection quantity shall be 10% of the number of Countersunk Carriage Bolt at each node, and shall not be less than 10, but no less than one for torque inspection.
    • 25 total views
    • 1 total member
    • Last updated Feb 9

Inspection Before Countersunk Carriage Bolt Delivery

Updates

  • ab yihui
    ab yihui posted a topic in the group Inspection Before Countersunk Carriage Bolt Delivery:
    Perform a general survey of high-strength bolts with a small hammer to prevent leakage.
    The inspection quantity shall be 10% of the number of Countersunk Carriage Boltat each node, and shall not be less than 10, but no less than one for torque inspecti...
    • Feb 9